Hot rubberized asphalt is a waterproofing membrane melted in a kettle and spread hot onto a concrete or board deck in two coats with a polyester fabric between them. It forms one seamless sheet about 5 mm thick. It is never left exposed: insulation, filter fabric and ballast, pavers or a green roof always go on top.
Quick facts
- The Canadian standard for hot rubberized asphalt is CAN/CGSB-37.50-M89.
- The baseline build is a coat at least 2 mm (1/12 in) thick, a spunbonded polyester fabric, then a second coat at least 3 mm (1/8 in) thick.
- Soprema's COLPHENE H goes on at 2.3 mm (90 mils) and 3.2 mm (125 mils), for a total system weight of 7.3 kg/m2 (1.5 lb/ft2).
- COLPHENE H is applied at 177 to 204 C (350 to 400 F) and can be installed at ambient temperatures down to -18 C (0 F).
- At drains, a reinforcing sheet at least 450 mm (18 in) square is centred over the drain, embedded in the membrane and clamped.
- The polyethylene separation sheet must be covered with insulation, fabric and ballast within 30 days.
- Stone ballast at a minimum of 48.8 kg/m2 (10 lb/ft2) covers the field, with a 1.2 m (4 ft) wide band at perimeters, drains and penetrations.
- Pavers are not recommended on slopes greater than 2 in 12 (16.7%).
What is hot rubberized asphalt?
Hot rubberized asphalt is a blend of asphalt, mineral fillers, elastomers, virgin or reclaimed oil and a thermoplastic resin. The rubber is worked into the asphalt by heating and blending at uniform temperatures and speeds. On the roof the crew applies it hot, and it forms an impermeable monolithic membrane, meaning one continuous layer with no seams.
The industry describes it as flexible at low temperatures, resistant to moisture and elastic. The product standard is CAN/CGSB-37.50-M89, Hot-Applied Rubberized Asphalt for Roofing and Waterproofing. Soprema's COLPHENE H meets that standard and is 100% solids, so nothing evaporates as it sets.
Soprema describes it as hot rubberized bitumen reinforced with SBS and mineral fillers, and says that solids content lets it harden quickly. HKS Construction Ltd is Soprema certified and installs two-ply, torch-down SBS roofing systems by Soprema, the manufacturer whose COLPHENE H figures run through this guide.
The membrane is not a sheet product like torch-on or TPO. It arrives in bags, Soprema's at 11.3 kg (25 lb) each, and the crew melts it on site.
The specification calls for a double-jacketed oil-bath kettle with mechanical agitation designed for rubberized asphalt. Soprema allows an oil-bath or air melter with agitation, says direct-fired melters are not recommended, and asks the crew to keep the melter at three-quarters full by adding product.
Why is hot rubber used under parkade and plaza decks?
Hot rubber is built for concrete decks that will be buried under something else. Soprema lists protected membrane (inverted) roofs, green roofs, plaza decks, bridges and below-grade foundations as its uses. The specification's own deck preparation covers cast-in-place concrete and precast concrete units, the structural slabs a podium or plaza deck is built on.
Several measured properties explain the fit. COLPHENE H shows 0 mm of flow at 60 C (140 F), water absorption of 0.06% after 96 hours at 50 C (122 F), and resistance to a hydrostatic pressure of 134 m (440 ft) of water.
Its water vapour permeance is 1.5 ng/Pa.s.m2 (0.026 perm). It passes low-temperature flexibility and crack bridging at -25 C (-13 F) with no adhesion loss, cracking or splitting.
Because it goes on as a hot liquid, it also follows the concrete. Joints, cracks and changes of plane are reinforced in place with fabric or neoprene embedded in the membrane, and the only laps are in the fabric buried inside it.
Does a hot rubber membrane have to be covered?
Yes. Hot rubberized asphalt is built as a protected membrane assembly, and Soprema states plainly that COLPHENE H is not for exposed applications. The insulation and ballast above it are part of the roof, not an optional extra.
The layers go on in a fixed order. Installers press a polyethylene separation sheet, 0.15 mm (6 mil) or 0.25 mm (10 mil), into the membrane while it is still hot and lap it dry at least 50 mm (2 in). It must be covered with insulation, fabric and ballast as soon as possible and within a maximum of 30 days. Soprema allows a 0.15 mm polyethylene layer or a SOPRABOARD protection board on horizontal work, and a SOPRABOARD or SOPRADRAIN on buried vertical surfaces.
Only extruded polystyrene insulation may be used with hot rubberized asphalt in a protected membrane assembly, to CAN/ULC S-701 Type 4. Boards are loose laid with staggered, tight joints, no gap wider than 9.5 mm, and within 20 mm (4/5 in) of every projection.
Where there is more than one layer, the bottom layer is the thickest and at least 50 mm (2 in). Soprema pairs COLPHENE H with SOPRA-XPS, which it rates at R-5 per inch.
Filter fabric goes over the insulation. Edges overlap at least 300 mm (12 in), no joint may run parallel to and within 1.8 m (6 ft) of the roof perimeter, and the fabric turns up at least 50 mm (2 in) above the ballast at perimeters and penetrations. It runs to drain bases but must never cover a drain.
The baseline specification and COLPHENE H compared
The specification sets minimums; Soprema's product sheet sets heavier coats and a wider fabric lap.
| Item | Baseline specification | Soprema COLPHENE H |
|---|---|---|
| Standard | CAN/CGSB-37.50-M89 | Complies with CAN/CGSB-37.50-M89 |
| First coat | At least 2 mm (1/12 in), continuous | At least 2.3 mm (90 mils) wet, about 3.0 kg/m2 (62 lb per 100 ft2), flat squeegee or roller, no notched squeegee |
| Reinforcement | Spunbonded polyester fabric, 1.5 mm (1/16 in) | COLPHENE H FLEECE spunbonded polyester, 0.26 mm (10.2 mils), 50 g/m2, unrolled into the hot base coat |
| Reinforcement lap | At least 25 mm (1 in) | At least 75 mm (3 in) |
| Second coat | At least 3 mm (1/8 in) | At least 3.2 mm (125 mils) wet, about 4.2 kg/m2 (86 lb per 100 ft2) |
| Total | At least 5 mm plus fabric | About 5.5 mm wet; total system weight 7.3 kg/m2 (1.5 lb/ft2) |
| Product temperature | Free-flowing at the manufacturer's recommended range | 177 to 204 C (350 to 400 F) at the substrate; recommended 193 to 204 C (380 to 400 F); flash point 275 C |
| Minimum air temperature | not stated | -18 C (0 F) |
| Primer | Asphalt or elastomeric primer, sprayed at 4 to 6 m2 per litre and allowed to dry | ELASTOCOL 500 required on porous substrates |
| Wood substrate | Plywood at least 12.7 mm (1/2 in); OSB 11 mm (7/16 in) listed as a support panel | Exterior plywood at least 16 mm (5/8 in); OSB and particle board not acceptable |
| Concrete | Monolithic, smooth, free of voids, laitance and honeycombs | Surface profile CSP 1 to 5, cured at least 14 days |
| Covering | Separation sheet, then insulation, fabric and ballast within 30 days | Polyethylene or SOPRABOARD over the still-warm membrane |
Two differences deserve your attention on a quote. The OSB rule conflicts, so with COLPHENE H the deck boards must be plywood. And COLPHENE H is not to be applied over lightweight or insulating concrete without written approval, or in enclosed areas with no ventilation.
What deck does hot rubber need?
Hot rubberized asphalt cannot be installed directly on a steel deck. A rigid support panel goes down first: plywood, glass-faced gypsum board, gypsum-fibre board, fibre-reinforced cementitious board or OSB under the baseline rules.
The crew lays boards at right angles to the flutes with tight joints, end joints staggered and supported on the ribs, and only as many boards as it can cover with membrane the same day. Wet, cracked or broken boards are not acceptable.
Concrete has its own rules. Poured concrete must be monolithic and smooth, free of voids, spalled areas, laitance, honeycombs and sharp protrusions. Precast units must be mechanically secured to limit differential movement, with every joint grouted and taped. All surfaces are swept and then blown clean with an air compressor before the membrane goes down.
The baseline specification names five support panels, each with a thickness, and most with a standard, that you can check against a quote.
| Support panel | Standard | Thickness |
|---|---|---|
| Glass-faced gypsum board, coated or non-coated | ASTM C1177 | 6.4 mm (1/4 in), 12.7 mm (1/2 in) or 15.9 mm (5/8 in) |
| Gypsum-fibre board | ASTM C1278 | 6.4 mm (1/4 in), 9.5 mm (3/8 in), 12.7 mm (1/2 in) or 15.9 mm (5/8 in) |
| Lightweight cementitious panel | Not stated | 9.5 mm (3/8 in) |
| Plywood | CSA O121, CSA O151 or CSA O153 | At least 12.7 mm (1/2 in) |
| Oriented strand board | CAN/CSA-O325 or the CSA O437 series | 11 mm (7/16 in) |
The same panels may go over a wood or concrete deck that is rough enough to damage the membrane or spoil its adhesion. They are held with corrosion-resistant fasteners and plates approved by the membrane maker for the deck type, and the specification names FM 4470 as the standard those fasteners should meet.
Whatever the deck, the surface must be clean, dry and smooth, with no depressions, voids, protrusions, unapproved curing compounds or release agents left on it. The asphalt primer is a penetrating, non-fibrated type made to CAN/CGSB 37-GP-9Ma; the elastomeric primer is the alternative for concrete or metal.
How is a hot rubber roof flashed at walls and drains?
Every joint, crack and turn is reinforced before the full membrane goes on, and the reinforcement depends on the deck and the size of the gap.
- Concrete cracks and non-moving joints of 1.5 mm (1/16 in) or less: a strip of fabric at least 150 mm (6 in) wide embedded in hot rubber.
- Cracks and joints wider than 1.5 mm: uncured neoprene embedded in hot rubber.
- Precast deck joints: along the length of the units, a 150 mm (6 in) fabric strip; at the ends of the units, a strip of uncured neoprene at least 300 mm (12 in) wide.
- Board deck joints: taped with a pressure-sensitive heat-resistant tape, or stripped in with hot rubber and 150 mm (6 in) fabric.
- Joints over 50 mm (2 in), or where more than 50% movement is expected: a prefabricated vulcanized rubber expansion joint.
- Curbs and penetrations: uncured neoprene embedded in hot rubber.
- Drains: a reinforcing sheet at least 450 mm (18 in) square, centred, fully embedded and held by the clamping ring.
Elastomeric reinforcement sheets are butyl, EPDM, uncured neoprene or chloroprene rubber at least 1.2 mm (0.05 in) thick. Soprema's matching product is SOPRA-FLASH UN47, uncured chloroprene (neoprene), for transitions, penetrations and drains, and it strongly recommends neoprene for details and upstands under greater structural stress.
The standard detail drawings show the same layering at a low parapet, a base flashing where the deck is carried by the wall, a curb, an exterior joint, a pipe, a roof drain and a pipe pocket.
Each one stacks hot rubber, a flexible flashing, membrane reinforcement and the separation sheet, then insulation, filter fabric and ballast, with metal flashing above and a tie-in to the wall air barrier. The manufacturer must review and approve non-typical edge details before the job starts.
Seamless in the field, hot rubber is still reinforced at every crack, joint and turn, with fabric for narrow gaps and neoprene for wider or stressed ones. Those details matter most because ballast and pavers will bury them.
Ballast, pavers and pedestals over the membrane
Ballast holds the loose insulation down and protects the membrane. A minimum of 48.8 kg/m2 (10 lb/ft2) of stone covers the field.
A 1.2 m (4 ft) wide band of stone, or a continuous row of precast concrete pavers providing at least 32.7 kg/m2 (6.7 lb/ft2), goes at every roof perimeter, penetration, drain and place where insulation boards end. Wind design may require more at the perimeter and in the field.
Pavers have their own limits. They are not recommended where the roof slope is greater than 2 in 12 (16.7%). Where pavers cover 10% or less of the roof they may sit directly on the insulation.
Above 10%, there must be a drainage layer or air space: profiled insulation, a gravel layer or pedestals giving at least 5 mm (3/16 in) of air space, with pedestal contact under 50% of the paver area.
Paver blocks may not exceed 610 mm by 610 mm (2 ft by 2 ft), so a crew can lift them for inspection.
Soprema's PAVER PEDESTALS suit terraces over a hot rubber membrane. They are injection-moulded polypropylene, adjustable from 8 to 20 mm for the H 8 up to 150 to 260 mm for the H 150, and up to four 110 mm extensions can be stacked on the H 90 and H 150.
A slope corrector levels slopes of 0% to 5%. Service temperature is -30 to 87 C (-22 to 189 F).
Breaking strength is more than one tonne on the full surface and more than 510 kg (1124 lb) on one quarter, falling to 235 kg (518 lb) on one quarter with four extensions. Soprema requires a structural engineer to assess an existing building before a terrace is added.
Walkways and sequencing belong to the same layer. The specification requires walkways at every traffic concentration point, such as roof hatches, access doors and rooftop ladders, regardless of how often they are used, and wherever rooftop equipment gets regular maintenance. Walkway pavers are loose laid over the filter fabric and butted in moderate contact with each other.
Where pavers cover a large area, venting must be provided between the top of the insulation and the pavers, as the insulation maker directs. Before any insulation goes down, the crew checks the membrane for damage and all flashing must be complete.
The insulation, fabric and ballast should then go on as each section is finished, with the ballast following the fabric immediately and the fabric fitted around every penetration so that stone cannot enter the gap between the penetration and the insulation.
Terms a hot rubber quote may use
Quotes and drawings for buried membranes use a handful of industry terms. The table gives the standard Canadian roofing definitions of the ones you will see most often.
| Term | Meaning |
|---|---|
| Protected membrane roof (PMR) | A roof where the membrane is applied to a suitable substrate and the insulation is placed on top of it and ballasted; also called an inverted roof |
| Roof terrace | A traffic-bearing or landscaped roof; also called a promenade, podium or plaza-deck roof, or a roof garden |
| Slip sheet or separator sheet | Sheet material placed between two layers of a roof system so that they do not adhere to each other; it also protects the lower layer |
| Neoprene | A synthetic rubber, polychloroprene, applied in liquid or sheet form in roofing membranes or flashing |
| Spunbonded fabric | Polyester or glass drawn in a molten state into continuous fibres, collected in random orientation on a moving belt and bonded with heat and pressure |
| Vulcanization | An irreversible change in a rubber compound's chemical structure, such as cross-linking, that makes it less plastic and extends its elastic properties over a greater range of temperature |
| Permeance | The rate of water vapour transmission per unit area, at a steady state, through a material, membrane or assembly |
| Waterproofing | Treatment of a surface or structure to prevent the passage of water under hydrostatic pressure |
What this means for a Calgary roof
For a Calgary condo podium, plaza or green roof, hot rubber is one of the few membranes that can go down in winter: COLPHENE H is rated to -18 C ambient, and Calgary winters regularly drop below -20 C, so cold snaps still stop the work.
Once buried, the membrane is protected from the summer ultraviolet and the June to August hail season, which is why the overburden, drains and 610 mm pavers are what a strata board should ask a commercial roofing contractor about.
HKS Construction Ltd can review your deck, drains and overburden and quote a hot rubber assembly or repair; call (587) 225-3419.
Questions people ask
What is hot rubberized asphalt?
A hot-applied blend of asphalt, elastomers, mineral fillers, oil and thermoplastic resin, made to CAN/CGSB-37.50-M89. The crew melts it in an agitated kettle and spreads it in two coats with a polyester fabric between them to form one seamless membrane.
How thick is a hot rubber membrane?
The baseline is at least 2 mm, then fabric, then at least 3 mm. Soprema's COLPHENE H calls for 2.3 mm and 3.2 mm coats, about 5.5 mm in total and 7.3 kg/m2.
Does a hot rubber membrane have to be covered?
Yes. It is designed as a protected membrane, Soprema says COLPHENE H is not for exposed use, and the separation sheet must be covered with insulation, fabric and ballast within 30 days.
Why is hot rubber used under parkade and plaza decks?
It is seamless, it bonds to concrete, and COLPHENE H resists 134 m of water head with 0.06% absorption. Its listed uses are inverted roofs, green roofs, plaza decks, bridges and foundations.
How is a hot rubber roof flashed at walls and drains?
Upstands, curbs and penetrations are reinforced with uncured neoprene embedded in hot rubber, and drains get a reinforcing sheet at least 450 mm square under the clamping ring. Metal flashing and the wall air barrier tie in above.
Can hot rubber be installed in winter?
COLPHENE H can be applied at ambient temperatures down to -18 C (0 F), with the product itself kept at 177 to 204 C. The deck must still be clean and dry, and boards cannot be wet.